220V Multifunctional Temperature And Humidity Test Chamber White And Blue
Contact Person : Jack He
Phone Number : +86-13842409825
WhatsApp : +8613842409825
Minimum Order Quantity : | 1 | Price : | To Be Negotiated |
---|---|---|---|
Packaging Details : | Wooden packing | Delivery Time : | 30-35 business days after received the payment |
Payment Terms : | L/C, T/T, Western Union | Supply Ability : | 25 per month |
Place of Origin: | China | Brand Name: | Envsin |
---|---|---|---|
Certification: | CE and ISO | Model Number: | EC4100 |
Detail Information |
|||
Product Name: | Temperature And Humidity Test Chamber | Test Space Dimension(mm): | 800W*800D*950H |
---|---|---|---|
External Dimension(mm): | 1090W*1960D*1995H | Temp. Range (℃): | -45/+180 |
Temp. Constancy (℃): | ±0.1-±0.5 | Temp. Homogeneity (℃): | ±0.5-±2.0 |
Heating Rate(℃/min): | 4.0 | Cooling Rate (℃/min): | 3.0 |
Temp. Max. Thermal Compensation (W): | 4500 | Power: | AC380V±10%,50HZ,3/N/PE |
High Light: | CE Temperature And Humidity Test Chamber,Customized Temperature And Humidity Test Chamber,Customized temp humidity chamber |
Product Description
Customized Temperature And Humidity Test Chamber With CE and ISO certification
The Temperature And Humidity Test Chamber is suitable for testing machine equipment, parts and materials at high temperature, low temperature and humid heat or humidity cycle conditions.The temperature and humidity test chamber provides conditions of temperature from -42 to +180 degree and of humidity from 10% to 98%.Please double check enclosed product specification.
•Fashionable design of modular construction |
•4 load power outlets for specimens with programmable control for protection |
•Special air circulation system inside ensures testing accuracy.(Patented) |
•Optional network video monitoring and data synchronization |
•Automatic water supply with ultra purifier devices(optional);water short agree minder function |
•Environment-friendly refrigerating control technology energy saving and rapid heating/cooling rate |
•Automatic reminder of equipment maintenance plans and software of recording malfunction |
•7 colors touch screen display and 3 bit control system;interface Ethernet/USB |
•Optional APP mobility management |
•Design with independent sensors to prevent specimens from damages caused by drew,overheat,breeze less and smog. |
•Special anti-condensation structures to avoid misjudgment and improve testing accuracy during climate testing.(Patented) |
•Strong control abilities of extreme-low humidity range 20℃/10% R.H.. |
• Unique operation mode: make testing area's temperature back to room temperature after tests are finished |
•Optional remote-assist service function and teaching CDs |
Model: |
EC4018 |
EC7034 |
EC4060 |
EC4100 |
EC7100 |
EC7150 |
Test Space Volume(L) | 190 | 335 | 600 | 990 | 1540 | |
Temperature Test Parameters: | ||||||
Temp. Range (℃) | -42/+180 | -72/+180 | -45/+180 | -45/+180 | -73/+180 | -73/+180 |
Temp. Constancy (℃) |
±0.1-±0.5 |
|||||
Temp. Homogeneity (℃) |
±0.5-±2.0 |
|||||
Heating Rate(℃/min) | 4.0 | 3.0 | 4.0 | 4.0 | 4.0 | 3.5 |
Cooling Rate (℃/min) | 4.0 | 3.0 | 3.0 | 3.0 | 2.5 | 2.3 |
Temp. Max. Thermal Compensation(W) |
2800 | 1500 | 1500 | 4500 | 3000 | 3000 |
Climate Test Parameters: | ||||||
Dewpoint Temp.Range (℃) |
+4(-3)-+94 |
|||||
Humid. Range (%RH) | 10-98 | |||||
Humid.Constancy (%RH) | ±1.0-±3 | |||||
Temp. Constancy (℃) | ±0.1-±0.3 | |||||
Temp. Homogeneity (℃) | ±0.5-±2.0 | |||||
Temp and Humid Max.Thermal Compensation(W) |
400 |
400 |
500 |
500 |
500 |
500 |
Power | AC380V±10%,50HZ,3/N/PE |
Optional Accessories: |
Standard Version: |
Independent sensors for specimen protection(NE60519-2.1993) |
3 Power outlets for specimens |
1 Entry port Φ100mm |
Left and right entry ports Φ50mm |
Drier filter for compressing air |
Silicon Stoppers for entry ports |
Automatic water supply device |
2 Stainless steel shelves |
Nitrogen gas auxiliary device |
1 Water tank with 20L |
Water-Cooled unit |
1 Water filter |
Spare parts package |
|
E-management and cyber software |
|
Video monitor system | |
APP for mobility management |
•The total mass of the load placed per cubic meter of studio volume shall not exceed 80KG
•The load of each layer of test material placement rack shall not exceed 20KG
•The load physical volume is not greater than 2/5 of the studio volume
•At any section perpendicular to the wind direction of the inner circulation, the total area of the sample load
should not be greater than 1/3 of the cross-sectional area of the studio in this direction. Oversized sample
load will affect the air balance and smooth of the studio
•GB/T 2423.1 low temperature test method 5, GJB 150.3 high temperature test
•GB/T 2423.2 high temperature test method 6, GJB 150.4 low temperature test
•GB/T2423.34 humid heat cycle test method 7, GJB 150.9 humid heat test
•IEC60068-2 temperature and humidity test method 8, MIL-STD-202G-103B humidity test
Integral, (temperature and humidity test chamber door direction is in front) front for the studio, refrigeration unit, after the electric control cabinet and electric control device, the main control interface is located in front of the test chamber door, expansion control panel is located in the right back of the test chamber. The door is open in the width direction. At the back of the studio, there are circulating air duct system and air conditioning system: centrifugal fan blade, air guide device, heater, humidifier, refrigeration heat exchanger, temperature and
humidity sensor.
Mode of transportation and Packing Instructions:
1. Packing: wooden case packing (outside the province), transportation packing case meeting the requirements of QB/WD008-2001
2. Mode of transportation: freight
Equipped with technical data and accessories:
1. Technical data: product qualification certificate, instruction manual, warranty card, etc.
Acceptance criteria and methods:
1. Acceptance criteria: The technical Pointers shall be in accordance with the "Technical Agreement" signed by both parties.The test method is according to GB5170.2008 standard
A prescribed method:
2. Acceptance method: Formal acceptance shall be carried out on the site of the Demander. If the demander requires a third party (qualified technical quality supervision department) to participate in the acceptance, the cost shall be borne by the demander.
If the first acceptance fails, the supplier shall bear the costs incurred in the second acceptance after improvement by the supplier.
Enter Your Message